NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Modular space station phase B extension program cost and schedules. Volume 1: Cost and schedule estimating process and resultsCost estimates and funding schedules are presented for a given configuration and costing ground rules. Cost methodology is described and the cost evolution from a baseline configuration to a selected configuration is given, emphasizing cases in which cost was a design driver. Programmatic cost avoidance techniques are discussed.
Document ID
19720011237
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Authors
Frassinelli, G. J.
(North American Rockwell Corp. Downey, CA, United States)
Date Acquired
August 6, 2013
Publication Date
January 1, 1972
Subject Category
Space Vehicles
Report/Patent Number
DRL-MSC-T-575
NASA-CR-115392
SD-71-226-1-VOL-1
Report Number: DRL-MSC-T-575
Report Number: NASA-CR-115392
Report Number: SD-71-226-1-VOL-1
Accession Number
72N18887
Funding Number(s)
CONTRACT_GRANT: NAS9-9953
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available