NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Spacecraft platform cost estimating relationshipsThe three main cost areas of unmanned satellite development are discussed. The areas are identified as: (1) the spacecraft platform (SCP), (2) the payload or experiments, and (3) the postlaunch ground equipment and operations. The SCP normally accounts for over half of the total project cost and accurate estimates of SCP costs are required early in project planning as a basis for determining total project budget requirements. The development of single formula SCP cost estimating relationships (CER) from readily available data by statistical linear regression analysis is described. The advantages of single formula CER are presented.
Document ID
19720014244
Acquisition Source
Legacy CDMS
Document Type
Technical Memorandum (TM)
Authors
Gruhl, W. M.
(NASA Headquarters Washington, DC United States)
Date Acquired
September 2, 2013
Publication Date
March 1, 1972
Subject Category
Space Vehicles
Report/Patent Number
NASA-TM-X-68851
Report Number: NASA-TM-X-68851
Accession Number
72N21894
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available