NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Apollo/Saturn 5 space vehicle countdown. Volume 2: Turnaround from scrubThe procedures required to prepare a space vehicle for subsequent launch attempt after cancelling lift-off activities are presented. The cancellation must occur after the start of cryogenic loading, but prior to initiation of ignition sequences. The sequence of operations necessary to return the space vehicle to a predetermined configuration at which time the launch count can be resumed or rescheduled for following launch opportunities is developed. The considerations and constraints that are the basis for the scrub/turnaround times are described.
Document ID
19720020267
Acquisition Source
Legacy CDMS
Document Type
Technical Memorandum (TM)
Date Acquired
September 2, 2013
Publication Date
March 15, 1972
Subject Category
Space Vehicles
Report/Patent Number
NASA-TM-X-68516
KSC-K-V-0513-2-VOL-2-REV-3
Report Number: NASA-TM-X-68516
Report Number: KSC-K-V-0513-2-VOL-2-REV-3
Accession Number
72N27917
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available