NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Calibration of Lewis hypersonic tunnel facility at Mach 5, 6, and 7Results of the initial calibration tests and a description of this true simulation facility are presented. Facility nozzles were calibrated over a range of stagnation pressure and temperature from 140 to 700 newtons per square centimeter and 1100 to 1750 K. The Reynolds number varied from 1.77 million to 7.44 million per meter. Mach numbers in the inviscid core of the three nozzles were 5.17 plus or minus 0.03, 6.05 plus or minus 0.02, and 7.25 plus or minus 0.08. Usable core diameters at the nozzle exit plane varied from 69 to 86 centimeters. True simulation with these performance capabilities and the test section size presently make this a unique operating facility.
Document ID
19730002510
Acquisition Source
Legacy CDMS
Document Type
Other - NASA Technical Note (TN)
Authors
Cullon, R. R.
(NASA Lewis Research Center Cleveland, OH, United States)
Lezberg, E. A.
(NASA Lewis Research Center Cleveland, OH, United States)
Date Acquired
September 2, 2013
Publication Date
November 1, 1972
Subject Category
Facilities, Research, And Support
Report/Patent Number
E-6928
NASA-TN-D-7100
Report Number: E-6928
Report Number: NASA-TN-D-7100
Accession Number
73N11237
Funding Number(s)
PROJECT: RTOP 762-75
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available