NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Surface electrical properties experiment study phase, volume 3The reliability and quality assurance system and procedures used in developing test equipment for the Lunar Experiment projects are described. The subjects discussed include the following: (1) documentation control, (2) design review, (3) parts and materials selection, (4) material procurement, (5) inspection procedures, (6) qualification and special testing, and failure modes and effects analysis.
Document ID
19730015110
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Date Acquired
September 2, 2013
Publication Date
January 1, 1973
Subject Category
Space Sciences
Report/Patent Number
NASA-CR-128920
Report Number: NASA-CR-128920
Accession Number
73N23837
Funding Number(s)
CONTRACT_GRANT: NAS9-10748
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available