NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
CVT/PCS phase 1 integrated testingFive breadboard experiments representing three Sortie Lab experiment disciplines were installed in a payload carrier simulator. A description of the experiments and the payload carrier simulator was provided. An assessment of the experiment interface with the simulator and an assessment of the simulator experiment support systems were presented. The results indicate that a hardware integrator for each experiment is essential; a crew chief, or mission specialist, for systems management and experimenter liaison is a vital function; a payload specialist is a practical concept for experiment integration and operation; an integration fixture for a complex experiment is required to efficiently integrate the experiment and carrier; simultaneous experiment utilization of simulator systems caused unexpected problems in meeting individual experiment requirements; experimenter traffic inside the dual-floor simulator did not hamper experiment operations; and the requirement for zero-g operation will provide a significant design challenge for some experiments.
Document ID
19730022475
Acquisition Source
Legacy CDMS
Document Type
Technical Memorandum (TM)
Authors
Mcbrayer, R. O.
(NASA Marshall Space Flight Center Huntsville, AL, United States)
Steadman, J. D.
(NASA Marshall Space Flight Center Huntsville, AL, United States)
Date Acquired
September 2, 2013
Publication Date
July 1, 1973
Subject Category
Facilities, Research, And Support
Report/Patent Number
NASA-TM-X-64770
Report Number: NASA-TM-X-64770
Accession Number
73N31207
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available