NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Life science payload definition and integration study, task C and D. Volume 3: AppendicesResearch equipment requirements were based on the Mini-7 and Mini-30 laboratory concepts defined in Tasks A and B of the intial LSPD contract. Modified versions of these laboratories and the research equipment within them were to be used in three missions of Shuttle/Sortie Module. These were designated (1) the shared 7-day laboratory (a mission with the life sciences laboratory sharing the sortie module with another scientific laboratory), (2) the dedicated 7-day laboratory (full use of the sortie module), and (3) the dedicated 30-day laboratory (full sortie module use with a 30-day mission duration). In defining the research equipment requirements of these laboratories, the equipment was grouped according to its function, and equipment unit data packages were prepared.
Document ID
19730024034
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Date Acquired
September 2, 2013
Publication Date
August 1, 1973
Subject Category
Space Vehicles
Report/Patent Number
CASD-NAS73-003-VOL-3
NASA-CR-124414
Report Number: CASD-NAS73-003-VOL-3
Report Number: NASA-CR-124414
Accession Number
73N32767
Funding Number(s)
CONTRACT_GRANT: NAS8-29150
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available