NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Saturn satellite encounter opportunities for Mariner Jupiter-Saturn 1977The opportunities for close satellite encounters which meet the planetary constraints at Saturn that are imposed by science value return and environmental conditions are investigated. Since the satellites travel at various speeds in their orbits, Saturn arrival time is critical and was chosen as the design parameter. Arrival times are recommended which afford close satellite encounters and also meet important mission constraints. A design chart illustrates the satellite opportunities as a function of Saturn arrival date. Through the use of such a design chart, the Saturn encounter design process, which will take place according to recommendations by the selected science investigators over the next several years, will be considerably streamlined. Potential applications are given to illustrate the use of the Saturn satellite opportunity chart in encounter design.
Document ID
19730024105
Acquisition Source
Legacy CDMS
Document Type
Other
Authors
Wallace, R. A.
(Jet Propulsion Lab., California Inst. of Tech. Pasadena, CA, United States)
Date Acquired
August 7, 2013
Publication Date
April 1, 1973
Publication Information
Publication: JPL Quart. Tech. Rev., Vol. 3, No. 1
Subject Category
Space Sciences
Accession Number
73N32838
Distribution Limits
Public
Copyright
Public Use Permitted.
Document Inquiry

Available Downloads

There are no available downloads for this record.
No Preview Available