NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Acquisition/expulsion system for earth orbital propulsion system study. Volume 4: Flight test articleTwo orbital test plans were prepared to verify one of the passive cryogenic storage tank/feedline candidate designs. One plan considered the orbital test article to be launched as a dedicated payload using an Atlas F burner launching configuration. The second plan proposed to launch the orbital test article as a secondary payload on the Titan E/Centaur proof flight. The secondary payload concept was pursued until January 1973, when work to build the hardware for this phase of the contract was terminated for lack of a sponsor for the flight. The dedicated payload launched on an Atlas F is described.
Document ID
19740004415
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Date Acquired
September 3, 2013
Publication Date
October 1, 1973
Subject Category
Space Vehicles
Report/Patent Number
NASA-CR-134156
MCR-73-97-VOL-4
Report Number: NASA-CR-134156
Report Number: MCR-73-97-VOL-4
Accession Number
74N12528
Funding Number(s)
CONTRACT_GRANT: NAS9-12182
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available