NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Space shuttle phase B. Volume 1: Executive summaryA study was conducted to identify the differences among total system concepts of space shuttle configurations. Emphasis was placed on concepts that lead to selection of a system that performs the missions within budget and schedule constraints. The spectrum of launch vehicle configurations is illustrated. An inboard profile of the spacecraft is presented to show the interior arrangement of the major subsystems. The performance prediction of the spacecraft during specified portions of the mission is analyzed. A cost comparison of the various concepts is included.
Document ID
19740023217
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Date Acquired
September 3, 2013
Publication Date
March 15, 1972
Subject Category
Space Vehicles
Report/Patent Number
SD-72-SH-0012-1
NASA-CR-134352
MSC-03332-VOL-1
Report Number: SD-72-SH-0012-1
Report Number: NASA-CR-134352
Report Number: MSC-03332-VOL-1
Accession Number
74N31330
Funding Number(s)
CONTRACT_GRANT: NAS9-10960
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available