NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Applications Technology Satellite ATS-6 in orbit checkout reportThe activities of the ATS-6 spacecraft for the checkout period of approximately four weeks beginning May 30, 1974 are described, along with the results of a performance evaluation of its subsystems and components. The following specific items are discussed: (1) subsystem requirements/specifications and in-orbit performance summary; (2) flight chronology; (3) spacecraft description; (4) structural/deployment subsystems; (5) electrical power subsystem; (6) thermal control subsystem; (7) telemetry and command subsystems; (8) attitude control subsystem; (9) spacecraft propulsion subsystem; (10) communication subsystem; and (12) experiment subsystem.
Document ID
19740024205
Acquisition Source
Legacy CDMS
Document Type
Technical Memorandum (TM)
Authors
Moore, W.
(Fairchild Industries, Inc.)
Prensky, W.
(Fairchild Industries, Inc.)
Date Acquired
September 3, 2013
Publication Date
August 1, 1974
Subject Category
Space Vehicles
Report/Patent Number
X-460-74-232
NASA-TM-X-70740
Report Number: X-460-74-232
Report Number: NASA-TM-X-70740
Accession Number
74N32318
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available