NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Skylab 1 and 2 - Pilots' reportDetails of powered flight are considered, giving attention to the lift-off, engine thrust, and separation from the S-1VB stage. The rendezvous checklist was performed on time and exactly prior to the first phasing maneuver. The Command Service Module was finally maneuvered to a position for hard docking. Attention is given to aspects of extravehicular activity during the mission and delays experienced in the separation procedure.
Document ID
19740036751
Acquisition Source
Johnson Space Center
Document Type
Abstract
Authors
Charles Conrad, Jr.
(United States Department of the Navy Arlington, Virginia, United States)
Joseph P Kerwin
(Johnson Space Center Houston, Texas, United States)
Date Acquired
August 7, 2013
Publication Date
January 1, 1974
Subject Category
Astronautics (General)
Accession Number
74A19501
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.

Available Downloads

There are no available downloads for this record.
No Preview Available