Reliability inputs to Mariner 9 data explosionThis paper describes the prelaunch and post-launch reliability functions which contributed to the success of the Mariner 9 spacecraft. Examples are included to illustrate how each reliability activity was a vital part of each phase of the project. Prelaunch reliability functions included: (1) establishing, negotiating, and monitoring system and subsystem requirements, (2) participating in spacecraft system and subsystem design/hardware reviews, (3) monitoring preparation of failure mode effects and criticality analyses (FMECA), (4) establishing and managing a problem failure reporting (PFR) system for the spacecraft and its support equipment, (5) monitoring electronic parts activities, and (6) participating in spacecraft reviews. Particular emphasis is placed on mission operations reliability assurance activities, which included: (1) spacecraft problem/failure reporting, (2) managing an integrating failure reporting system which covered all mission operations activities, (3) real-time analysis of spacecraft anomalies, and (4) risk assessment.
Document ID
19740038210
Acquisition Source
Legacy CDMS
Document Type
Conference Proceedings
Authors
Macgregor, D. S.
Paul, F. A. (California Institute of Technology, Jet Propulsion Laboratory, Pasadena Calif., United States)
Date Acquired
August 7, 2013
Publication Date
January 1, 1974
Subject Category
Space Vehicles
Meeting Information
Meeting: Annual Reliability and Maintainability Symposium