NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
MSFC engineering support to Skylab operationsMajor engineering support provided during the Skylab mission from the Marshall Space Flight Center and its contractors to the Mission Control Center at Houston was essential to Skylab success. The need for this type of support was anticipated during premission preparations due to the complexity and first-flight nature of the Skylab, but the requirements were greatly magnified by the problems encountered early in the mission. The MFSC engineering support organization and its interface to the Mission Control Center is described. The importance of close cooperation between the operating and engineering organizations in this type of mission is discussed. Illustrations are given from more than 1800 systems analysis actions worked out during the nine-month Skylab mission by more than 600 support engineers.
Document ID
19740059318
Acquisition Source
Legacy CDMS
Document Type
Conference Paper
Authors
Kurtz, H. F., Jr.
Clarke, W. G.
Naumcheff, M.
(NASA Marshall Space Flight Center Operations Development Div., Huntsville, Ala., United States)
Date Acquired
August 7, 2013
Publication Date
August 1, 1974
Subject Category
Space Vehicles
Report/Patent Number
AAS PAPER 74-116
Report Number: AAS PAPER 74-116
Meeting Information
Meeting: Annual Meeting
Location: Los Angeles, CA
Start Date: August 20, 1974
End Date: August 22, 1974
Sponsors: American Astronautical Society
Accession Number
74A42068
Distribution Limits
Public
Copyright
Other

Available Downloads

There are no available downloads for this record.
No Preview Available