NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Management approach recommendations. Earth Observatory Satellite system definition study (EOS)Management analyses and tradeoffs were performed to determine the most cost effective management approach for the Earth Observatory Satellite (EOS) Phase C/D. The basic objectives of the management approach are identified. Some of the subjects considered are as follows: (1) contract startup phase, (2) project management control system, (3) configuration management, (4) quality control and reliability engineering requirements, and (5) the parts procurement program.
Document ID
19750007618
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Date Acquired
September 3, 2013
Publication Date
October 1, 1974
Subject Category
Spacecraft Design, Testing And Performance
Report/Patent Number
TRW-22296-6001-RU-003
NASA-CR-143644
FR-4
Report Number: TRW-22296-6001-RU-003
Report Number: NASA-CR-143644
Report Number: FR-4
Accession Number
75N15690
Funding Number(s)
CONTRACT_GRANT: NAS5-20519
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available