NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Tug fleet and ground operations schedules and controls. Volume 3: Program cost estimatesCost data for the tug DDT&E and operations phases are presented. Option 6 is the recommended option selected from seven options considered and was used as the basis for ground processing estimates. Option 6 provides for processing the tug in a factory clean environment in the low bay area of VAB with subsequent cleaning to visibly clean. The basis and results of the trade study to select Option 6 processing plan is included. Cost estimating methodology, a work breakdown structure, and a dictionary of WBS definitions is also provided.
Document ID
19750010235
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Date Acquired
September 3, 2013
Publication Date
February 1, 1975
Subject Category
Spacecraft Design, Testing And Performance
Report/Patent Number
NASA-CR-120648
MCR-74-488-VOL-3
Report Number: NASA-CR-120648
Report Number: MCR-74-488-VOL-3
Accession Number
75N18307
Funding Number(s)
CONTRACT_GRANT: NAS8-31011
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available