NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Report to the administrator by the NASA Aerospace Safety Advisory Panel on the Skylab program. Volume 1: Summary reportContractor and NASA technical management for the development and manufacture of the Skylab modules is reviewed with emphasis on the following management controls: configuration and interface management; vendor control; and quality control of workmanship. A review of the modified two-stage Saturn V launch vehicle which focused on modifications to accommodate the Skylab payload; resolution of prior flight anomalies; and changes in personnel and management systems is presented along with an evaluation of the possible age-life and storage problems for the Saturn 1-B launch vehicle. The NASA program management's visibility and control of contractor operations, systems engineering and integration, the review process for the evaluation of design and flight hardware, and the planning process for mission operations are investigated. It is concluded that the technical management system for development and fabrication of the modules, spacecraft, and launch vehicles, the process of design and hardware acceptance reviews, and the risk assessment activities are satisfactory. It is indicated that checkout activity, integrated testing, and preparations for and execution of mission operation require management attention.
Document ID
19750015572
Acquisition Source
Legacy CDMS
Document Type
Technical Memorandum (TM)
Date Acquired
September 3, 2013
Publication Date
January 1, 1973
Subject Category
Launch Vehicles And Space Vehicles
Report/Patent Number
NASA-TM-X-66814
Report Number: NASA-TM-X-66814
Accession Number
75N23644
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available