NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Automated space processing payloads study. Volume 3: Equipment development resource requirementsFacilities are described on which detailed preliminary design was undertaken and which may be used on early space shuttle missions in the 1979-1982 time-frame. The major hardware components making up each facility are identified, and development schedules for the major hardware items and the payload buildup are included. Cost data for the facilities, and the assumptions and ground rules supporting these data are given along with a recommended listing of supporting research and technology needed to ensure confidence in the ability to achieve successful development of the equipment and technology.
Document ID
19750016706
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Date Acquired
September 3, 2013
Publication Date
January 1, 1975
Subject Category
Astronautics (General)
Report/Patent Number
NASA-CR-120775
BSR-4171-VOL-3
Report Number: NASA-CR-120775
Report Number: BSR-4171-VOL-3
Accession Number
75N24778
Funding Number(s)
CONTRACT_GRANT: NAS8-30741
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available