NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
The Viking Mars Orbiter 1975 solar energy controllerThe Jet Propulsion Laboratory is responsible for the Viking Orbiter System, which is part of the overall Viking Project managed by the Viking Project Office at Langley Research Center for NASA. The spacecraft will be launched on a Titan IIIE/-Centaur Launch Vehicle in August 1975. Solar energy for temperature control purposes is introduced into the propulsion module of the Orbiter. The energy enters by way of four individually commandable solar energy controllers (SECs). This paper summarizes the SEC thermal development, design and test results. Test results are presented for the prototype unit and for the flight units.
Document ID
19750048821
Acquisition Source
Legacy CDMS
Document Type
Conference Paper
Authors
Stultz, J. W.
(California Institute of Technology, Jet Propulsion Laboratory, Pasadena Calif., United States)
Date Acquired
August 8, 2013
Publication Date
May 1, 1975
Subject Category
Spacecraft Design, Testing And Performance
Report/Patent Number
AIAA PAPER 75-677
Report Number: AIAA PAPER 75-677
Meeting Information
Meeting: American Institute of Aeronautics and Astronautics, Thermophysics Conference
Location: Denver, CO
Start Date: May 27, 1975
End Date: May 29, 1975
Sponsors: American Institute of Aeronautics and Astronautics
Accession Number
75A32893
Funding Number(s)
CONTRACT_GRANT: NAS7-100
Distribution Limits
Public
Copyright
Other

Available Downloads

There are no available downloads for this record.
No Preview Available