NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Shuttle LOX loading transient study. Task 2 milestone report. National space and technology laboratories (NSTL) LOX loading facility analysisTransient thermodynamic analyses were made of the LOX loading system proposed for the space shuttle main propulsion test article (MPTA). This system is made up of a LOX replenish system and a main LOX line which include the barge tank, the lines, pumps, and valves between the barge and the orbiter (ORB) ground service equipment (GSE) interface, the MPTA fill system, the space shuttle main engine (SSME) chilldown bleed system, and the GSE vent system. System analyses include predictions of system performance sensitivity to operating sequence and LOX flowrate, temperature, and quality at the ORB/GSE interface. The transient thermodynamic conditions at the SSME feed line entrance, ET entrance (tank bottom), and the SSME bleed/GSE vent TEE are also included. The analyses are based on continuous SSME bleed flow during GSE facility chilldown.
Document ID
19760003248
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Authors
Glasgow, V. L.
(Boeing Aerospace Co. Huntsville, AL, United States)
Date Acquired
September 3, 2013
Publication Date
May 8, 1975
Subject Category
Engineering (General)
Report/Patent Number
NASA-CR-144009
Report Number: NASA-CR-144009
Accession Number
76N10336
Funding Number(s)
CONTRACT_GRANT: NAS8-30745
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available