NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Feasibility study: Liquid hydrogen plant, 30 tons per dayThe design considerations of the plant are discussed in detail along with management planning, objective schedules, and cost estimates. The processing scheme is aimed at ultimate use of coal as the basic raw material. For back-up, and to provide assurance of a dependable and steady supply of hydrogen, a parallel and redundant facility for gasifying heavy residual oil will be installed. Both the coal and residual oil gasifiers will use the partial oxidation process.
Document ID
19760006224
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Date Acquired
September 3, 2013
Publication Date
May 1, 1975
Subject Category
Engineering (General)
Report/Patent Number
NASA-CR-145898
Report Number: NASA-CR-145898
Accession Number
76N13312
Funding Number(s)
CONTRACT_GRANT: NASW-2809
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available