NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Frequency modulation system test procedure shuttle task 501 approach and landing test configurationShuttle Task 501 is an in-line task to test the performance and compatibility of radiofrequency links between the SSO and ground, and relay via a satellite. Under Shuttle Task 501 approach and landing test (ALT) phase only a limited portion of the communication and tracking (C&T) equipment is to be tested. The principal item to be tested is a frequency modulated (FM) data link. To test this RF link, an ALT FM System was designed, constructed, and the console wiring verified. A step-by-step procedure to be used to perform the ALT FM system is presented. The ALT FM system test is to be performed prior to delivery of the equipment to the Electronic Systems Test Laboratory (ESTL).
Document ID
19760011117
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Authors
Doland, G. D.
(Lockheed Electronics Co. Houston, TX, United States)
Date Acquired
September 3, 2013
Publication Date
January 1, 1976
Subject Category
Space Communications, Spacecraft Communications, Command And Tracking
Report/Patent Number
JSC-10866
NASA-CR-147467
LEC-7500
Report Number: JSC-10866
Report Number: NASA-CR-147467
Report Number: LEC-7500
Accession Number
76N18205
Funding Number(s)
CONTRACT_GRANT: NAS9-12200
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available