NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Space Tug Docking Study. Volume 5: Cost AnalysisThe cost methodology, summary cost data, resulting cost estimates by Work Breakdown Structure (WBS), technical characteristics data, program funding schedules and the WBS for the costing are discussed. Cost estimates for two tasks of the study are reported. The first, developed cost estimates for design, development, test and evaluation (DDT&E) and theoretical first unit (TFU) at the component level (Level 7) for all items reported in the data base. Task B developed total subsystem DDT&E costs and funding schedules for the three candidate Rendezvous and Docking Systems: manual, autonomous, and hybrid.
Document ID
19760014161
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Date Acquired
September 3, 2013
Publication Date
March 1, 1976
Subject Category
Space Transportation
Report/Patent Number
MCR-76-3-VOL-5
NASA-CR-144243
Report Number: MCR-76-3-VOL-5
Report Number: NASA-CR-144243
Accession Number
76N21249
Funding Number(s)
CONTRACT_GRANT: NAS8-31542
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available