NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Due to the lapse in federal government funding, NASA is not updating this website. We sincerely regret this inconvenience.

Back to Results
Energy Conversion Alternatives Study (ECAS), Westinghouse phase 1. Volume 7: Metal vapor Rankine topping-steam bottoming cyclesAdding a metal vapor Rankine topper to a steam cycle was studied as a way to increase the mean temperature at which heat is added to the cycle to raise the efficiency of an electric power plant. Potassium and cesium topping fluids were considered. Pressurized fluidized bed or pressurized (with an integrated low-Btu gasifier) boilers were assumed. Included in the cycles was a pressurizing gas turbine with its associated recuperator, and a gas economizer and feedwater heater. One of the ternary systems studied shows plant efficiency of 42.3% with a plant capitalization of $66.7/kW and a cost of electricity of 8.19 mills/MJ (29.5 mills/kWh).
Document ID
19760016610
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Authors
Deegan, P. B.
(Westinghouse Research Labs. Pittsburgh, PA, United States)
Date Acquired
September 3, 2013
Publication Date
February 12, 1976
Subject Category
Energy Production And Conversion
Report/Patent Number
NASA-CR-134941-VOL-7
REPT-76-9E9-ECAS-RLV.7-VOL-7
Report Number: NASA-CR-134941-VOL-7
Report Number: REPT-76-9E9-ECAS-RLV.7-VOL-7
Accession Number
76N23698
Funding Number(s)
CONTRACT_GRANT: E(49-18)-1751
CONTRACT_GRANT: NSF AG-551
CONTRACT_GRANT: NAS3-19407
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available