Viking mission supportOn April 26, 1976, the network operations control center was declared available for planetary operations in support of the Viking project. This final capability in the network configuration for Viking had been delayed since February with hardware and software problems both in the control center and at the Deep Space stations. The effect of these problems, particularly insofar as they affected production of intermediate data records, the resolution of the problems, and the current status of the network operations control center in the Viking environment, are given in this article. Also discussed are the operational verification tests performed to check out the new capabilities and associated procedures. The Viking project tests supported by the DSN and finally the DSN support of Viking cruise operations, along with some statistics on performance, are included.
Document ID
19760020177
Acquisition Source
Legacy CDMS
Document Type
Other
Authors
Mudgway, D. J.
(Jet Propulsion Lab., California Inst. of Tech. Pasadena, CA, United States)
Johnston, D. W.
(Jet Propulsion Lab., California Inst. of Tech. Pasadena, CA, United States)
Date Acquired
August 8, 2013
Publication Date
June 15, 1976
Publication Information
Publication: The Deep Space Network
Subject Category
Ground Support Systems And Facilities (Space)
Accession Number
76N27265
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.

Available Downloads

There are no available downloads for this record.
No Preview Available