NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
DSN research and technology supportThe activities of the Venus Station (DSS 13) and the Microwave Test Facility (MTF) during the period April 19 through June 13, 1976, are discussed and progress noted. Continuing reliability testing and computer program refinement of the remote controlled, unattended automated pulsar observing station is noted, along with routine observations of 17 pulsars. Radar observations of a geostationary satellite are reported, along with the routine automatic testing of the stability of the DSS 13 maser-receiving system. Additional testing of thermal characteristics of semiflexible coaxial cables is reported, along with phase stabilization measurements thereon. Routine support of the planetary radio astronomy experiment, with 43.25 hours of observations of Jupiter and various radio calibration sources, is reported, along with 18.75 hours of differential VLBI observations in conjunction with Australia, DSS 43. Modifications of the clock synchronization winterization system are reported, along with a discussion of the activities of the DSN High-Power Transmitter Maintenance Facility.
Document ID
19760022246
Acquisition Source
Legacy CDMS
Document Type
Other
Authors
Jackson, E. B.
(Jet Propulsion Lab., California Inst. of Tech. Pasadena, CA, United States)
Date Acquired
August 8, 2013
Publication Date
August 15, 1976
Publication Information
Publication: The Deep Space Network
Subject Category
Ground Support Systems And Facilities (Space)
Accession Number
76N29334
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.

Available Downloads

There are no available downloads for this record.
No Preview Available