NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Tracking subsystem test requirements surveyA survey of the test and checkout requirements of the tracking portion of the communications and tracking subsystem was performed to evaluate adequacy of planned tests and test requirement documents. Emphasis is placed on identifying test completeness, duplications, and omissions. Items that may save time, aid in testing, and present a more complete integrated test program are also noted. The results of this survey are summarized.
Document ID
19760026190
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Authors
Orr, D. H.
(McDonnell-Douglas Technical Services Co., Inc. Houston, TX, United States)
Tatosian, C. G.
(McDonnell-Douglas Technical Services Co., Inc. Houston, TX, United States)
Bynum, M. C.
(McDonnell-Douglas Technical Services Co., Inc. Houston, TX, United States)
Zook, A. W.
(McDonnell-Douglas Technical Services Co., Inc. Houston, TX, United States)
Date Acquired
September 3, 2013
Publication Date
March 17, 1975
Subject Category
Spacecraft Instrumentation
Report/Patent Number
NASA-CR-151016
DN-1.3-DN-C0201-002
Report Number: NASA-CR-151016
Report Number: DN-1.3-DN-C0201-002
Accession Number
76N33278
Funding Number(s)
CONTRACT_GRANT: NAS9-13970
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available