NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
The Space Shuttle's testing gauntletThe Space Shuttle verification program is detailed, with verification network flowcharts. Performance qualification tests, life endurance tests, structural verification tests, and vibration/dynamic tests of components, subsystems, and major systems at various test levels are dealt with. Ground tests, static firings of the Shuttle main engine, external-tank separation tests, ground vibration tests of vehicle mated to external tank, and main propulsion tests and test scheduling are described. Functions of the Shuttle avionics integration laboratory and electronic systems test laboratory are discussed. Test preparations and procedures for orbital flight testing, launch pad tests, and Shuttle approach- and landing-tests are described.
Document ID
19760033748
Acquisition Source
Legacy CDMS
Document Type
Reprint (Version printed in journal)
Authors
Mcintosh, G. P.
(NASA Lyndon B. Johnson Space Center Houston, TX, United States)
Larkin, T. P.
(NASA Johnson Space Center Houston, Tex., United States)
Date Acquired
August 8, 2013
Publication Date
January 1, 1976
Publication Information
Publication: Astronautics and Aeronautics
Volume: 14
Subject Category
Ground Support Systems And Facilities (Space)
Accession Number
76A16714
Distribution Limits
Public
Copyright
Other

Available Downloads

There are no available downloads for this record.
No Preview Available