NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Payload specialist station study. Volume 2, part 1: Preliminary design documentThe details of six tasks of the payload Specialist Station study are discussed: (1) derive payload control and display requirements; (2) perform functional analyses; (3) perform system synthesis; (4) perform trade studies; (5) perform preliminary design; and (6) provide data format. Functional analysis diagrams were developed for the study payloads. These diagrams presented the payload's functional activities flow based on the six mission phases established. These phases are: (1) launch, ascent, orbit insertion; (2) on-orbit checkout and activation; (3) on-orbit operation; (4) deployment/retrieval; (5) on-orbit deactivation; and (6) descent, landing, post-landing. To perform system synthesis the widest variety of available hardware and software, as individual pieces of equipment and as systems, was investigated. The intent was to synthesize a complete AFD system or systems which could accommodate the range of requirements identified for the study missions.
Document ID
19770008129
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Date Acquired
September 3, 2013
Publication Date
November 1, 1976
Subject Category
Space Transportation
Report/Patent Number
MCR-76-403-VOL-2-PT-1
NASA-CR-150131
Report Number: MCR-76-403-VOL-2-PT-1
Report Number: NASA-CR-150131
Accession Number
77N15072
Funding Number(s)
CONTRACT_GRANT: NAS8-31789
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available