NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Payload specialist station study. Volume 3: Program study cost estimates. Part 1: Work breakdown structureThe work breakdown structure (WBS) for the Payload Specialist Station (PSS) is presented. The WBS is divided into two elements--PSS contractor and mission unique requirements. In accordance with the study ground rules, it is assumed that a single contractor, hereafter referred to as PSS Contractor will perform the following: (1) provide C and D hardware (MFDS and elements of MMSE), except for GFE; (2) identify software requirements; (3) provide GSE and ground test software; and (4) perform systems engineering and integration in support of the Aft Flight Deck (AFD) C and D concept. The PSS Contractor WBS element encompasses a core or standardized PSS concept. Payload peculiar C and D requirements identified by users will originate as a part of the WBS element mission unique requirements; these requirements will be provided to the PSS Contractor for implementation.
Document ID
19770008132
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Date Acquired
September 3, 2013
Publication Date
November 6, 1976
Subject Category
Space Transportation
Report/Patent Number
NASA-CR-150134
MCR-76-403-VOL-3-PT-1
Report Number: NASA-CR-150134
Report Number: MCR-76-403-VOL-3-PT-1
Accession Number
77N15075
Funding Number(s)
CONTRACT_GRANT: NAS8-31789
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available