NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Due to the lapse in federal government funding, NASA is not updating this website. We sincerely regret this inconvenience.

Back to Results
Payload crew activity planning integration. Task 2: Inflight operations and training for payloadsThe primary objectives of the Payload Crew Activity Planning Integration task were to: (1) Determine feasible, cost-effective payload crew activity planning integration methods. (2) Develop an implementation plan and guidelines for payload crew activity plan (CAP) integration between the JSC Orbiter planners and the Payload Centers. Subtask objectives and study activities were defined as: (1) Determine Crew Activity Planning Interfaces. (2) Determine Crew Activity Plan Type and Content. (3) Evaluate Automated Scheduling Tools. (4) Develop a draft Implementation Plan for Crew Activity Planning Integration. The basic guidelines were to develop a plan applicable to the Shuttle operations timeframe, utilize existing center resources and expertise as much as possible, and minimize unnecessary data exchange not directly productive in the development of the end-product timelines.
Document ID
19770011795
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Authors
Hitz, F. R.
(Martin Marietta Corp. Denver, CO, United States)
Date Acquired
September 3, 2013
Publication Date
December 23, 1976
Subject Category
Man/System Technology And Life Support
Report/Patent Number
NASA-CR-151187
Report Number: NASA-CR-151187
Accession Number
77N18739
Funding Number(s)
CONTRACT_GRANT: NAS9-14676
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available