NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Space station systems analysis study. Part 2, Volume 3: Appendixes, Book 1. Program requirements documentationThe objective elements representative of the kinds of space activities that will be supported by the space construction base (SCB) are discussed in (1) a brief mission overview including the primary purpose and general objectives; (2) descriptions of the processes involved (where applicable), the mission hardware, the principal activities to be undertaken, the test requirements, and the principal tests; and (3) the SCB requirements including such items as special devices (e.g., fabrication modules, assembly or construction fixtures, cranes, and airlocks), power, data management and communications, waste management, environmental control, safety, and logistics. Each program option is then described in terms of the objective elements it supports, its orbit, the general makeup of the SCB, the transportation approach, and the program schedule goals. The specific requirements that are imposed on the SCB in order to support program option L are given.
Document ID
19770012193
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Date Acquired
September 3, 2013
Publication Date
February 28, 1977
Subject Category
Launch Vehicles And Space Vehicles
Report/Patent Number
MDC-G6715-PT-2-VOL-3
NASA-CR-151227
Report Number: MDC-G6715-PT-2-VOL-3
Report Number: NASA-CR-151227
Accession Number
77N19137
Funding Number(s)
CONTRACT_GRANT: NAS9-14958
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available