NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Program Documentation for Elapsed Time to Oxygen and Hydrogen Caution and Warning System for Captive/active 1 and 3 FlightsHigh pressure gas storage simulation runs were made to compute the elapsed time from T-O disconnect (transfer to onboard reactant) to the caution and warning pressures for the primary oxygen (O2) and hydrogen (H2) systems of Orbiter Vehicle (OV) 101. The simulation runs were made for approach and landing test flights Captive/Active 1 and Captive/Active 3.
Document ID
19770016243
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Authors
Hurst, J. E.
(Lockheed Electronics Co. Houston, TX, United States)
Date Acquired
September 3, 2013
Publication Date
April 1, 1977
Subject Category
Spacecraft Design, Testing And Performance
Report/Patent Number
LEC-10443
JSC-12618
NASA-CR-151339
Report Number: LEC-10443
Report Number: JSC-12618
Report Number: NASA-CR-151339
Accession Number
77N23187
Funding Number(s)
CONTRACT_GRANT: NAS9-15200
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available