Formulation of consumables management models: Test plan for the mission planning processor working modelThe test plan and test procedures to be used in the verification and validation of the software being implemented in the mission planning processor working model program are documented. The mission planning processor is a user oriented tool for consumables management and is part of the total consumables subsystem management concept. An overview of the working model is presented. Execution of the test plan will comprehensively exercise the working model software. An overview of the test plan, including a testing schedule, is presented along with the test plan for the unit, module, and system levels. The criteria used to validate the working model results for each consumables subsystem is discussed.
Document ID
19770018264
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Authors
Connelly, L. C.
(TRW Defense and Space Systems Group Redondo Beach, CA, United States)
Date Acquired
September 3, 2013
Publication Date
May 30, 1977
Subject Category
Astronautics (General)
Report/Patent Number
TRW-26821-H017-RO-00
NASA-CR-151433
Report Number: TRW-26821-H017-RO-00
Report Number: NASA-CR-151433
Accession Number
77N25208
Funding Number(s)
CONTRACT_GRANT: NAS9-14264
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available