NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Space shuttle engineering and operations support. Avionics system engineeringThe shuttle avionics integration laboratory (SAIL) requirements for supporting the Spacelab/orbiter avionics verification process are defined. The principal topics are a Spacelab avionics hardware assessment, test operations center/electronic systems test laboratory (TOC/ESL) data processing requirements definition, SAIL (Building 16) payload accommodations study, and projected funding and test scheduling. Because of the complex nature of the Spacelab/orbiter computer systems, the PCM data link, and the high rate digital data system hardware/software relationships, early avionics interface verification is required. The SAIL is a prime candidate test location to accomplish this early avionics verification.
Document ID
19770018292
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Authors
Broome, P. A.
(McDonnell-Douglas Corp. Saint Louis, MO, United States)
Neubaur, R. J.
(McDonnell-Douglas Corp. Saint Louis, MO, United States)
Welsh, R. T.
(McDonnell-Douglas Corp. Saint Louis, MO, United States)
Date Acquired
September 3, 2013
Publication Date
May 20, 1976
Subject Category
Spacecraft Design, Testing And Performance
Report/Patent Number
REPT-1.3-DN-C0712-003
NASA-CR-151364
Report Number: REPT-1.3-DN-C0712-003
Report Number: NASA-CR-151364
Accession Number
77N25236
Funding Number(s)
CONTRACT_GRANT: NAS9-14960
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available