NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
DSN research and technology supportThe ongoing activities at the Venus Station (DSS 13) and the Microwave Test Facility (MTF) discussed include: (1) equipment implementation for unattended operation at DSS 13; (2) salvaging of a 20-kW klystron, at a cost savings of several thousand dollars by the DSN High Power Transmitter Facility; (3) extensive tracking activities with the 26-m antenna including DSN Platform Parameters, Multistation Planetary Radar, Helios II Spectrum Broadening Analysis, VLBI Validation, Planetary Radio Astronomy, and Pulsar Rotation Constancy, for a total time of 219-1/4 observing hours; (4) clock synchronization transmissions from the DSS 13 master clock to the overseas 64-m antenna complexes and special implementation activities in support of PV-78; and (5) implementation of a hydrogen maser frequency standard and the pathfinder installation of a utility control system (UCS) and significant station modification and maintenance.
Document ID
19770024267
Acquisition Source
Legacy CDMS
Document Type
Other
Authors
Jackson, E. B.
(Jet Propulsion Lab., California Inst. of Tech. Pasadena, CA, United States)
Date Acquired
August 8, 2013
Publication Date
August 15, 1977
Publication Information
Publication: The Deep Space Network
Subject Category
Ground Support Systems And Facilities (Space)
Accession Number
77N31211
Funding Number(s)
PROJECT: RTOP 311-03-15-30
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.

Available Downloads

There are no available downloads for this record.
No Preview Available