NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
STS payloads mission control study continuation phase A-1. Volume 2-B: Task 2. Evaluation and refinement of implementation guidelines for the selected STS payload operator conceptThe functions of Payload Operations Control Centers (POCC) at JSC, GSFC, JPL, and non-NASA locations are analyzed to establish guidelines for standardization, and facilitate the development of a fully integrated NASA-wide system of ground facilities for all classes of payloads. Operational interfaces between the space transportation system operator and the payload operator elements are defined. The advantages and disadvantages of standardization are discussed.
Document ID
19770024289
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Date Acquired
September 3, 2013
Publication Date
August 1, 1976
Subject Category
Space Transportation
Report/Patent Number
TRW-26904-H019-RO-00-VOL-2B
NASA-CR-151027
Report Number: TRW-26904-H019-RO-00-VOL-2B
Report Number: NASA-CR-151027
Accession Number
77N31233
Funding Number(s)
CONTRACT_GRANT: NAS9-14484
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available