NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Standard spacecraft economic analysis. Volume 1: Executive summaryA study of the comparative program costs associated with use of various standardized spacecraft for Air Force space test program missions to be flown on the space shuttle during the 1980-1990 time period is reviewed. The first phase of the study considered a variety of procurement mixes composed of existing or programmed NASA standard spacecraft designs and a Air Force standard spacecraft design. The results were briefed to a joint NASA/Air Force audience on July 11, 1976. The second phase considered additional procurement options using an upgraded version of an existing NASA design. The results of both phases are summarized.
Document ID
19770026280
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Authors
Harris, E. D.
(RAND Corp. Santa Monica, CA, United States)
Large, J. P.
(RAND Corp. Santa Monica, CA, United States)
Date Acquired
September 3, 2013
Publication Date
November 1, 1976
Subject Category
Astronautics (General)
Report/Patent Number
R-2099/1-NASA-VOL-1
NASA-CR-152538
Report Number: R-2099/1-NASA-VOL-1
Report Number: NASA-CR-152538
Accession Number
77N33224
Funding Number(s)
CONTRACT_GRANT: NAS5-23376
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available