Space Shuttle Orbiter approach and landing program statusThe space shuttle approach and landing test (ALT) program is being conducted in four phases. The first phase, completed in March of 1977, consisted of verifying the airworthiness of the mated B-747 shuttle carrier aircraft and orbiter. The second phase consists of checking the orbiter systems in captive flight. The third phase is to be confined to launching the orbiter with and without the tail cone installed to evaluate the final landing phase of the shuttle operations through the verification of the automatic landing system. The fourth and final phase of the program is to document the mated configuration's performance relative to the ferry operations to be conducted between the return from the orbiter's landing sites and launch sites. This paper presents the results of the SCA inert orbiter flight testing and the program plans up to the completion of the ALT program.
Document ID
19770061462
Acquisition Source
Legacy CDMS
Document Type
Conference Paper
Authors
Andrews, W. H. (NASA Flight Research Center Edwards, Calif., United States)
Date Acquired
August 9, 2013
Publication Date
August 1, 1977
Subject Category
Space Transportation
Report/Patent Number
AIAA PAPER 77-1204Report Number: AIAA PAPER 77-1204
Meeting Information
Meeting: Aircraft Systems and Technology Meeting
Location: Seattle, WA
Start Date: August 22, 1977
End Date: August 24, 1977
Sponsors: American Institute of Aeronautics and Astronautics