NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Space station systems analysis study. Part 3: Documentation. Volume 7: SCB alternate EPS evaluation, task 10Power levels up to 100 kWe average were baselined for the electrical power system of the space construction base, a long-duration manned facility capable of supporting manufacturing and large scale construction projects in space. Alternatives to the solar array battery systems discussed include: (1) solar concentrator/brayton; (2) solar concentrator/thermionic; (3) isotope/brayton; (4) nuclear/brayton; (5) nuclear thermoelectric; and (6) nuclear thermionic.
Document ID
19780002242
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Date Acquired
September 3, 2013
Publication Date
September 1, 1977
Subject Category
Launch Vehicles And Space Vehicles
Report/Patent Number
MDC-G6954-PT-3-VOL-7
NASA-CR-151535
Report Number: MDC-G6954-PT-3-VOL-7
Report Number: NASA-CR-151535
Accession Number
78N10185
Funding Number(s)
CONTRACT_GRANT: NAS9-14958
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available