NASA Logo

NTRS

NTRS - NASA Technical Reports Server

The auto‑search feature has been disabled based on user feedback. Enter a search term/phrase and click “Search” to begin.

Back to Results
Assess 2: Spacelab simulation. Executive summaryAn Airborne Science/Spacelab Experiments System Simulation (ASSESS II) mission, was conducted with the CV-990 airborne laboratory in May 1977. The project studied the full range of Spacelab-type activities including management interactions, experiment selection and funding, hardware development, payload integration and checkout, mission specialist and payload specialist selection and training, mission control center payload operations control center arrangements and interactions, real time interaction during flight between principal investigators and the flight crew, and retrieval of scientific flight data. ESA established an integration and coordination center for the ESA portion of the payload as planned for Spacelab. A strongly realistic Spacelab mission was conducted on the CV-990 aircraft. U.S. and ESA scientific experiments were integrated into a payload and flown over a 10 day period, with the payload flight crew fully-confined to represent a Spacelab mission. Specific conclusions for Spacelab planning are presented along with a brief explanation of each.
Document ID
19780005145
Acquisition Source
Legacy CDMS
Document Type
Technical Memorandum (TM)
Date Acquired
September 3, 2013
Publication Date
July 1, 1977
Subject Category
Astronautics (General)
Report/Patent Number
NASA-TM-78444
A-7229
ESA-SL(77)1
Report Number: NASA-TM-78444
Report Number: A-7229
Report Number: ESA-SL(77)1
Accession Number
78N13088
Funding Number(s)
PROJECT: RTOP 975-40-12-01
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available