NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Feasibility study of an Integrated Program for Aerospace-vehicle Design (IPAD) system. Volume 6: Implementation schedule, development costs, operational costs, benefit assessment, impact on company organization, spin-off assessment, phase 1, tasks 3 to 8A baseline implementation plan, including alternative implementation approaches for critical software elements and variants to the plan, was developed. The basic philosophy was aimed at: (1) a progressive release of capability for three major computing systems, (2) an end product that was a working tool, (3) giving participation to industry, government agencies, and universities, and (4) emphasizing the development of critical elements of the IPAD framework software. The results of these tasks indicate an IPAD first release capability 45 months after go-ahead, a five year total implementation schedule, and a total developmental cost of 2027 man-months and 1074 computer hours. Several areas of operational cost increases were identified mainly due to the impact of additional equipment needed and additional computer overhead. The benefits of an IPAD system were related mainly to potential savings in engineering man-hours, reduction of design-cycle calendar time, and indirect upgrading of product quality and performance.
Document ID
19780008066
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Authors
Garrocq, C. A.
(General Dynamics/Convair San Diego, CA, United States)
Hurley, M. J.
(General Dynamics/Convair San Diego, CA, United States)
Dublin, M.
(General Dynamics/Convair San Diego, CA, United States)
Date Acquired
September 3, 2013
Publication Date
August 30, 1973
Subject Category
Aerodynamics
Report/Patent Number
NASA-CR-132406
Report Number: NASA-CR-132406
Accession Number
78N16009
Funding Number(s)
CONTRACT_GRANT: NAS1-11431
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available