NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Integrated guidance, navigation and control verification plan primary flight systemThe verification process and requirements for the ascent guidance interfaces and the ascent integrated guidance, navigation and control system for the space shuttle orbiter are defined as well as portions of supporting systems which directly interface with the system. The ascent phase of verification covers the normal and ATO ascent through the final OMS-2 circularization burn (all of OPS-1), the AOA ascent through the OMS-1 burn, and the RTLS ascent through ET separation (all of MM 601). In addition, OPS translation verification is defined. Verification trees and roadmaps are given.
Document ID
19780021201
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Date Acquired
September 3, 2013
Publication Date
May 1, 1978
Subject Category
Space Transportation
Report/Patent Number
NASA-CR-151815
SD-78-SH-0141
Report Number: NASA-CR-151815
Report Number: SD-78-SH-0141
Accession Number
78N29144
Funding Number(s)
CONTRACT_GRANT: NAS9-14000
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available