NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Automatic welding of stainless steel tubingThe use of automatic welding for making girth welds in stainless steel tubing was investigated as well as the reduction in fabrication costs resulting from the elimination of radiographic inspection. Test methodology, materials, and techniques are discussed, and data sheets for individual tests are included. Process variables studied include welding amperes, revolutions per minute, and shielding gas flow. Strip chart recordings, as a definitive method of insuring weld quality, are studied. Test results, determined by both radiographic and visual inspection, are presented and indicate that once optimum welding procedures for specific sizes of tubing are established, and the welding machine operations are certified, then the automatic tube welding process produces good quality welds repeatedly, with a high degree of reliability. Revised specifications for welding tubing using the automatic process and weld visual inspection requirements at the Kennedy Space Center are enumerated.
Document ID
19780022260
Acquisition Source
Legacy CDMS
Document Type
Technical Memorandum (TM)
Authors
Clautice, W. E.
(NASA John F. Kennedy Space Center Cocoa Beach, FL, United States)
Date Acquired
September 3, 2013
Publication Date
August 1, 1978
Subject Category
Metallic Materials
Report/Patent Number
TR-1626
NASA-TM-79759
Report Number: TR-1626
Report Number: NASA-TM-79759
Accession Number
78N30203
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available