NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
DSS 13 antenna subsystem automationUnattended station operation was implemented that permitted full operational control from the network operations center (NOCC). Sensors were installed in the mechanical subsystem to monitor critical functions and to permit automated premission checkout of the subsystem, automated reaction to component failure, and identification of failed components under control of the antenna pointing computer. This monitoring installation is a prototype for monitoring equipment to be installed throughout the DSN.
Document ID
19780024206
Acquisition Source
Legacy CDMS
Document Type
Other
Authors
Phillips, H.
(Jet Propulsion Lab., California Inst. of Tech. Pasadena, CA, United States)
Crane, I.
(Jet Propulsion Lab., California Inst. of Tech. Pasadena, CA, United States)
Lipsius, P.
(Jet Propulsion Lab., California Inst. of Tech. Pasadena, CA, United States)
Date Acquired
August 9, 2013
Publication Date
August 15, 1978
Publication Information
Publication: The Deep Space Network
Subject Category
Electronics And Electrical Engineering
Accession Number
78N32149
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.

Available Downloads

There are no available downloads for this record.
No Preview Available