NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Space Shuttle Orbiter approach and landing program statusThe approach and landing test (ALT) phase of the Space Shuttle program aims at assessing the Orbiter's subsonic aerodynamic flight and landing characteristics along with the support equipment, ground facilities, and the approximate hardware and software to be used in the terminal phase of orbital missions. The program also evaluates the performance of the Shuttle carrier aircraft (SCA) as related to the transport of the Orbiter to the launch sites during the stages of Space Shuttle operations. Results are presented for the SCA inert Orbiter flight testing and the program plans up to the completion of the ALT program. Emphasis is placed on testing the airworthiness of the mated B-747 Shuttle carrier aircraft and Orbiter, checkout of the Orbiter systems in captive flight, and launching the Orbiter with and without the tail cone installed. Major program milestones before the first manned orbital flight are summarized in graphic form.
Document ID
19780035519
Acquisition Source
Legacy CDMS
Document Type
Conference Proceedings
Authors
Andrews, W. H.
(NASA Hugh L. Dryden Flight Research Center Edwards, CA, United States)
Mcmurtry, T. C.
(NASA Flight Research Center Edwards, Calif., United States)
Date Acquired
August 9, 2013
Publication Date
January 1, 1977
Subject Category
Space Transportation
Meeting Information
Meeting: Annual Symposium
Location: Washington, DC
Start Date: August 10, 1977
End Date: August 12, 1977
Accession Number
78A19428
Distribution Limits
Public
Copyright
Other

Available Downloads

There are no available downloads for this record.
No Preview Available