NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Generalized environmental control and life support system computer program (G1894), phase 3The work performed during Phase 3 of the Generalized Environmental Control Life Support System (ECLSS) Computer Program is reported. Phase 3 of this program covered the period from December 1977 to September 1978. The computerized simulation of the Shuttle Orbiter ECLSS was upgraded in the following areas: (1) the payload loop of the Shuttle simulation was completely recoded and checked out; (2) the Shuttle simulation water and freon loop initialization logic was simplified to permit easier program input for the user; (3) the computerized simulation was modified to accept the WASP subroutine, which is a subroutine to evaluate thermal properties of water and freon; (4) the 1108 operating system was upgraded by LEC; (5) the Shuttle simulation was modified to permit failure cases which simulate zero component flow values; and (6) the Shuttle SEPS version was modified and secure files were setup on the 1108 and 1110 systems to permit simulation runs to be made from remote terminals.
Document ID
19790002570
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Authors
Mcenulty, R. E.
(McDonnell-Douglas Astronautics Co. Huntington Beach, CA, United States)
Date Acquired
September 3, 2013
Publication Date
September 1, 1978
Subject Category
Man/System Technology And Life Support
Report/Patent Number
NASA-CR-151836
MDC-G7699
Report Number: NASA-CR-151836
Report Number: MDC-G7699
Accession Number
79N10741
Funding Number(s)
CONTRACT_GRANT: NAS9-14877
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available