NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
OAST Space Theme Workshop. Volume 3: Working group summary. 6: Power (P-2). A. Statement. B. Technology needs (form 1). C. Priority assessment (form 2)Power requirements for the multipurpose space power platform, for space industrialization, SETI, the solar system exploration facility, and for global services are assessed for various launch dates. Priorities and initiatives for the development of elements of space power systems are described for systems using light power input (solar energy source) or thermal power input, (solar, chemical, nuclear, radioisotopes, reactors). Systems for power conversion, power processing, distribution and control are likewise examined.
Document ID
19790006954
Acquisition Source
Legacy CDMS
Document Type
Conference Paper
Date Acquired
September 3, 2013
Publication Date
January 1, 1976
Subject Category
Astronautics (General)
Report/Patent Number
NASA-TM-80013
Report Number: NASA-TM-80013
Accession Number
79N15125
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available