NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
SAMICS Validation. SAMICS Support Study, Phase 3SAMICS provides a consistent basis for estimating array costs and compares production technology costs. A review and a validation of the SAMICS model are reported. The review had the following purposes: (1) to test the computational validity of the computer model by comparison with preliminary hand calculations based on conventional cost estimating techniques; (2) to review and improve the accuracy of the cost relationships being used by the model: and (3) to provide an independent verification to users of the model's value in decision making for allocation of research and developement funds and for investment in manufacturing capacity. It is concluded that the SAMICS model is a flexible, accurate, and useful tool for managerial decision making.
Document ID
19790018320
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Date Acquired
September 3, 2013
Publication Date
March 1, 1979
Subject Category
Energy Production And Conversion
Report/Patent Number
DOE/JPL-955123-79/1
JPL-9950-100
NASA-CR-158746
Report Number: DOE/JPL-955123-79/1
Report Number: JPL-9950-100
Report Number: NASA-CR-158746
Accession Number
79N26491
Funding Number(s)
CONTRACT_GRANT: JPL-955123
CONTRACT_GRANT: NAS7-100
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available