NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Space construction systems analysis study. Task 3: Construction system shuttle integrationThe implications and impacts devolving upon the orbiter by its utilization as a space construction facility for the selected flight system projects are presented.
Document ID
19790022096
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Date Acquired
September 3, 2013
Publication Date
June 1, 1979
Subject Category
Astronautics (General)
Report/Patent Number
NASA-CR-160296
Report Number: NASA-CR-160296
Accession Number
79N30267
Funding Number(s)
CONTRACT_GRANT: NAS9-15718
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available